Reconciliation
Purpose
Assign standup dates and assess stope performance.
Steps
-
Set standup dates - Set the open and close date for the stope. Blast dates can be used as a starting point.
-
Visualise Results: a. 3D Viewer - visualise OB/UB vs design/mined surveys. b. Per Stope Summary - overall volumes. c. Per Face Summary - detailed breakdown.
-
Export results
observação
Projected distances around development will be inconsistent but isn't a concern as these faces are normally filtered out for analysis.
cuidado
Large differences between octree and signed mesh volumes often indicate poor mesh quality.
Video
Explains the Reconciliation-Quantifying stope performance window layout and tools in the stope reconciliation Wizard App.